Christian Huemer


Image
Ao.Univ.Prof. Mag.rer.soc.oec.
Dr.rer.soc.oec.

Christian Huemer

  • About: main scope: inter-organizational systems, conceptual modeling, ERP systems electronic data exchange, electronic billing
  • Orcid:
  • Keywords: Model Engineering, Electronic Data Interchange, E-Business, Service Sciences, Business Process Modeling
  • Roles: Associate Professor

Publications

Modelling Interorganizational Business Processes
Marco ZapletalRainer SchusterPhilipp LieglChristian HuemerBirgit HofreiterJan vom BrockeMichael Rosemann

View .bib

Handle: 20.500.12708/26913; Year: 2010; Issued On: 2010-01-01; Type: Publication; Subtype: Book Contribution; Peer Reviewed:

Keywords:
Astract: United Nation's Centre for Trade Facilitation and Electronic Business (UN/CEFACT) is an e-business standardization body known for its work on UN/EDIFACT and ebXML. One of its on-going work items is the UN/CEFACT Modeling Methodology (UMM) for modeling global choreographies of B2B scenarios. The work on UMM started in 1998 and has improved since then by contributions from participating organizations, such as RosettaNet, SWIFT, GS 1. Today, all new UN/CEFACT standards for data exchange scenarios must be backed up by a corresponding UMM model. In this paper, we revisit the UMM version 1.0 that is defined as a UML 1.4 profile. We introduce the main concepts of UMM and elaborate on the strengths and weaknesses of UMM 1.0. Being the editorial team of UMM, we have made improvements to UMM, which will be released shortly as a new standard version. Thus, we elaborate on the new concepts of UMM 2.0 that are further illustrated by means of a simple example.

Zapletal, M., Schuster, R., Liegl, P., Huemer, C., & Hofreiter, B. (2010). Modelling Interorganizational Business Processes. In J. vom Brocke & M. Rosemann (Eds.), Handbook on Business Process Management 1 (pp. 543–564). Springer. http://hdl.handle.net/20.500.12708/26913
Flexible Workflow Management in Service Oriented Environments
Birgit HofreiterChristian Huemer

View .bib

Handle: 20.500.12708/27421; Year: 2010; Issued On: 2010-01-01; Type: Publication; Subtype: Book Contribution; Peer Reviewed:

Keywords:
Astract: Ever faster changing market conditions require businesses to frequently adapt their business processes and the underlying workflow systems. Serviceoriented architectures are said to deliver this flexibility by loose coupling. In this chapter we provide a survey on realizing flexible workflows on top of service oriented architectures.We show how orchestrations and choreographies may be implemented by state-of-the-art web services technology. The role of agents in realizing workflows among services is discussed. Furthermore, we discuss service provision in dynamic environments, when partners are dynamically bound to the workflow and when changes to the workflow schema happen.

Hofreiter, B., & Huemer, C. (2010). Flexible Workflow Management in Service Oriented Environments. In Agent-Based Service Oriented Computing (pp. 81–111). Springer-Verlag, Heidelberg. http://hdl.handle.net/20.500.12708/27421
A Composable, QoS-Aware and Web Services-Based Execution Model for ebXML BPSS Business Transactions
Andreas SchönbergerGuido WirtzChristian HuemerMarco Zapletal

View .bib

Handle: 20.500.12708/50865; Year: 2010; Issued On: 2010-01-01; Type: Publication; Subtype: Inproceedings; Peer Reviewed:

Keywords:
Astract: Adequate IT support for Business-to-Business integration(B2Bi) is indispensable in today´s globalized world. Agreement among personnel from different enterprises as well as distributed computing issues are major challenges to the automation of B2Bi processes. These challenges can be addressed by applying the choreography language ebXML BPSS (ebBP) for declaratively specifying B2Bi processes and using Web services and WS-BPEL as dedicated integration technologies. ebBP Business Transactions (BT) are the primary building block of ebBP choreographies and specify the exchange of up to two business documents in a declarative and technology-agnostic way. Composing BTs within choreographies and realization of QoS raise important requirements for the orchestration layer. This paper investigates these requirements and presents a composable, abstract, flexible and QoS-aware execution model that can be implemented using Web Services and BPEL.

Schönberger, A., Wirtz, G., Huemer, C., & Zapletal, M. (2010). A Composable, QoS-Aware and Web Services-Based Execution Model for ebXML BPSS Business Transactions. In 2010 6th World Congress on Services. 6th World Congress on Services, Miami, Non-EU. IEEE Computer Society. https://doi.org/10.1109/services.2010.46
Managing Variability and Evolution of Business Document Models
Christian PichlerMartina SeidlChristian HuemerGoetz BotterweckPatrick HeymansItay MamanAndreas PleussJulia Rubin

View .bib

Handle: 20.500.12708/53210; Year: 2010; Issued On: 2010-01-01; Type: Publication; Subtype: Inproceedings; Peer Reviewed:

Keywords:
Astract: The United Nations Centre for Trade Facilitation and eBusiness UN/CEFACT) standardizes business documents for electronic data interchange. Their approaches towards UN/EDIFACT and XML have later been followed by a conceptual modeling approach called Core components (CC). Having used this approach for four years in practice, it became evident that the support for managing business document models is a prerequisite for successfully utilizing CC. This includes handling variants of business document models on the one hand, and managing the evolution of business document models on the other hand. In this paper we propose an approach to face these challenges by the means of Software Product Line Engineering (SPLE) in combination with dedicated model management operators. The contribution of the approach is twofold. First, SPLE is successfully applied in a new field enabling us to manage variants of business document models. Second, the model management operators support the evolution of business document model variants, whereas the operators defined, contribute to the evolution of product lines as well.

Pichler, C., Seidl, M., & Huemer, C. (2010). Managing Variability and Evolution of Business Document Models. In G. Botterweck, P. Heymans, I. Maman, A. Pleuss, & J. Rubin (Eds.), Proceedings of the 2nd International Workshop on Model-driven Product Line Engineering (MDPLE 2010) (pp. 61–72). CEUR-WS.org. http://hdl.handle.net/20.500.12708/53210
Size Matters!? Measuring the Complexity of XML Schema Mapping Models
Christian PichlerMichael StrommerChristian Huemer

View .bib

Handle: 20.500.12708/53220; Year: 2010; Issued On: 2010-01-01; Type: Publication; Subtype: Inproceedings; Peer Reviewed:

Keywords:
Astract: Exchanging structured business documents is inevitable for successful collaboration in electronic commerce. A prerequisite, for fostering the interoperability between business partners utilizing different business document standards, is a mapping between different standards. However, the effort involved in creating those mappings is hard to estimate. For example, the complexity of standardized formats is one crucial aspect affecting the effort of the mapping process. Therefore, a notion of complexity is desirable for both, manual as well as automatic mapping processes. For this reason we develop an initial set of metrics, based on well established metrics for XML Schema, allowing to analyze the complexity of business document standards. Having such metrics at hand allows estimating the complexity and hence the mapping effort of a business document standard, prior to the actual mapping process. We demonstrate the complexity metrics on three different business document standards from the electronic commerce domain.

Pichler, C., Strommer, M., & Huemer, C. (2010). Size Matters!? Measuring the Complexity of XML Schema Mapping Models. In 2010 6th World Congress on Services. International Workshop on Service Computing for B2B, Bangalore, Non-EU. IEEE. https://doi.org/10.1109/services.2010.64


Teaching

Project in Computer Science 1
Semester: 2025S; Nr: 194.145; Type: PR; Hours: 4.0; Language: if required in English; View on TISS

Project in Computer Science 2
Semester: 2025S; Nr: 194.146; Type: PR; Hours: 4.0; Language: if required in English; View on TISS

Orientation Informatics and Business Informatics
Semester: 2024W; Nr: 180.766; Type: VU; Hours: 1.0; Language: German; View on TISS

Seminar for Master Students in Data Science
Semester: 2024W; Nr: 180.772; Type: SE; Hours: 1.0; Language: English; View on TISS

Seminar for Master Students in Business Informatics
Semester: 2024W; Nr: 180.779; Type: SE; Hours: 1.0; Language: English; View on TISS

Research Seminar
Semester: 2024W; Nr: 188.446; Type: SE; Hours: 2.0; Language: if required in English; View on TISS

Literature Seminar for PhD Students
Semester: 2024W; Nr: 188.512; Type: SE; Hours: 2.0; Language: German; View on TISS

Bachelor Thesis for Informatics and Business Informatics
Semester: 2024W; Nr: 188.926; Type: PR; Hours: 5.0; Language: if required in English; View on TISS

Scientific Research and Writing
Semester: 2024W; Nr: 193.052; Type: SE; Hours: 2.0; Language: German; View on TISS

Software Engineering
Semester: 2024W; Nr: 194.020; Type: VU; Hours: 4.0; Language: German; View on TISS

Research Methods
Semester: 2024W; Nr: 194.078; Type: SE; Hours: 2.0; Language: English; View on TISS

Technology for People 2040
Semester: 2024W; Nr: 194.082; Type: VU; Hours: 2.0; Language: German; View on TISS

Project in Computer Science 1
Semester: 2024W; Nr: 194.145; Type: PR; Hours: 4.0; Language: if required in English; View on TISS

Project in Computer Science 2
Semester: 2024W; Nr: 194.146; Type: PR; Hours: 4.0; Language: if required in English; View on TISS

Sustainability in Computer Science
Semester: 2024W; Nr: 194.155; Type: VU; Hours: 2.0; Language: English; View on TISS


Projects

Bankenabwicklungsmonitor (BAM)
Name: FMA - BAM; Title: Bankenabwicklungsmonitor (BAM); Begins On: 2024-05-13; Ends On: 2025-01-12; Context: Finanzmarktaufsicht (FMA); View Project Website

Datenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe II
Name: FMA-AT4DAZ-Stufe2; Title: Datenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe II; Begins On: 2024-01-01; Ends On: 2024-12-31; Context: FMA-Finanzmarktaufsicht; View Project Website

Datenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe I
Name: FMA-AT4DAZ; Title: Datenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe I; Begins On: 2023-12-05; Ends On: 2023-12-31; Context: FMA-Finanzmarktaufsicht; View Project Website

Erforderlichkeit einer Datenbank für Analysezwecke
Name: FMA-DB; Title: Erforderlichkeit einer Datenbank für Analysezwecke; Begins On: 2023-10-16; Ends On: 2024-01-15; Context: FMA-Finanzmarktaufsicht; View Project Website

Digitale Kompetenzen @ Parlament
Name: DKP; Title: Digitale Kompetenzen @ Parlament; Begins On: 2021-04-01; Ends On: 2021-09-30; Context: Parlamentsdirektion; View Project Website

BIM in tunnelling
Name: BIM im Tunnelbau; Title: BIM in tunnelling; Begins On: 2020-07-01; Ends On: 2023-12-31; Context: Österr. Bautechnik Veranstaltungs G; View Project Website

Innovationslehrgang zur Gestaltung der Digitalen Transformation in der Produktentwicklung und Produktion
Name: DigiTrans 4.0; Title: Innovationslehrgang zur Gestaltung der Digitalen Transformation in der Produktentwicklung und Produktion; Begins On: 2016-09-01; Ends On: 2018-11-30; Context: Austrian Research Promotion Agency (FFG); View Project Website

Sparx Systems Innovations Scheck Plus
Name: Sparx Systems InnovScheckPlus; Title: Sparx Systems Innovations Scheck Plus; Begins On: 2014-04-01; Ends On: 2015-02-16; Context: Austrian Research Promotion Agency (FFG); View Project Website

Multi-Tenant ERP System in the Cloud: A Model-Driven Approach Based on the Resource-Event-Agent Ontology
Name: REAlist; Title: Multi-Tenant ERP System in the Cloud: A Model-Driven Approach Based on the Resource-Event-Agent Ontology; Begins On: 2013-09-01; Ends On: 2015-08-31; Context: Austrian Research Promotion Agency (FFG); View Project Website

Web of Needs INfrastructure
Name: WIN; Title: Web of Needs INfrastructure; Begins On: 2012-07-01; Ends On: 2014-10-31; Context: Austrian Research Promotion Agency (FFG); View Project Website

E-business Registry Permitting Enterprise Liaisons
Name: ERPEL; Title: E-business Registry Permitting Enterprise Liaisons; Begins On: 2010-05-01; Ends On: 2013-08-31; Context: Austrian Research Promotion Agency (FFG); View Project Website

Rail track gauging Austrian Federal Railways
Name: SWITCH09; Title: Rail track gauging Austrian Federal Railways; Begins On: 2009-07-01; Ends On: 2009-08-31; Context: Berner & Mattner Systemtechnik GmbH; View Project Website

ebInterface 3.0 - electronic invoicing
Name: ebInterface 3.0; Title: ebInterface 3.0 - electronic invoicing; Begins On: 2009-01-01; Ends On: 2010-02-28; Context: Austriapro c/o Wirtschaftskammer Österrecih; View Project Website

Public Private Interoperability
Name: PPI; Title: Public Private Interoperability; Begins On: 2008-10-01; Ends On: 2011-09-30; Context: Austrian Research Promotion Agency (FFG); View Project Website

Business Semantics on top of Process Technology
Name: BSopt; Title: Business Semantics on top of Process Technology; Begins On: 2008-04-01; Ends On: 2010-09-30; Context: Austrian Research Promotion Agency (FFG); View Project Website

ebTransfer - Design and Realization of Know-How Transfer for electronic Billing based on ebInterface
Name: ebTransfer; Title: ebTransfer - Design and Realization of Know-How Transfer for electronic Billing based on ebInterface; Begins On: 2007-01-01; Ends On: 2007-11-30; Context: BM für Wirtschaft und Arbeit; View Project Website

Team

Business Informatics Group, TU Wien

Head


Team member

Henderik Proper

Univ.Prof. PhD

Professors


Team member

Christian Huemer

Ao.Univ.Prof. Mag.rer.soc.oec.
Dr.rer.soc.oec.

Team member

Dominik Bork

Associate Prof. Dipl.-Wirtsch.Inf.Univ.
Dr.rer.pol.

Team member

Gerti Kappel

O.Univ.Prof.in Dipl.-Ing.in
Mag.a Dr.in techn.

Team member

Henderik Proper

Univ.Prof. PhD

Visiting Scientists


Team member

Christiane Floyd

Hon.Prof.in Dr.in phil.

Team member

Johanna Barzen

Dr. phil.

Administration



Researchers


Team member

Aleksandar Gavric

Univ.Ass. MEng. B.Eng.

Team member

Galina Paskaleva

Projektass.in Dipl.-Ing.in
Dipl.-Ing.in BSc

Team member

Marianne Schnellmann

Univ.Ass.in BSc MSc

Team member

Marion Murzek

Senior Lecturer Mag.a rer.soc.oec.
Dr.in rer.soc.oec.

Team member

Marion Scholz

Senior Lecturer Dipl.-Ing.in
Mag.a rer.soc.oec.

Team member

Miki Zehetner

Univ.Ass. DI Bakk.rer.soc.oec. MSc

Team member

Syed Juned Ali

Univ.Ass. BSc MSc

External Researchers




Team member

Marco Huymajer

Univ.Ass. Dipl.-Ing.